NEW SAN JUAN DE MARCONA PORT TERMINAL
AwardedConcession for the design, financing, construction, operation and maintenance of a new public port terminal, specialized in providing storage and shipping services for iron and copper concentrates, as well as mining production inputs.
US$ 404.80 Millones
Adjudicación Directa (estimada)*: -
* En caso de presentarse terceros interesados, la buena pro se realiza por Concurso.
HUANCAYO-HUANCAVELICA RAILWAY
AwardedThe project consists of the execution of necessary improvement and rehabilitation works along the railway line (128.7 km), in 2 sections (T1 78 km; T2 50 km), acquisition of rolling stock with the aim of providing the rail transport service through an operator, as well as infrastructure and rolling stock maintenance
US$ 565.00 Millones
Buena Pro (estimada): 08/28/2024
SOCIAL MANAGEMENT, DESIGN AND EXECUTION OF HYDRAULIC INFRASTRUCTURE PROJECTS, CONSTRUCTION, IMPLEMENTATION, AND EXPLOITATION OF THE MINING CONCESSIONS COMPRISING THE TG-3 DEPOSIT OF THE EL ALGARROBO PROJECT.
AwardedThe El Algarrobo project is a private initiative within Active Projects that encompasses the exploration, underground exploitation, and processing of a mineralized deposit of copper, zinc, and silver in the mining concessions Tambo Grande N°4, 5, 9, and 10. Additionally, it includes the execution of hydraulic infrastructure with a focus on sustainable development aimed at ensuring water supply to the communities. The project will be developed in stages, beginning with the construction of hydraulic infrastructure and obtaining a Social Agreement that will allow for the initiation of mining operations, followed by exploration studies and the construction of the mine.
US$ 2,753.00 Millones
Adjudicación Directa (estimada)*: -
* En caso de presentarse terceros interesados, la buena pro se realiza por Concurso.
WASTEWATER TREATMENT FOR FINAL DISPOSAL AND/OR REUSE FOR THE PROVINCE OF CHINCHA
AwardedThe project proposes to optimize wastewater treatment in the province of Chincha through the extension and improvement of 2 primary collectors and the construction, operation and maintenance of new WWTPs. It is projected to benefit 345,000 inhabitants.? 15 km of interceptor and collector lines?? 1 pumping chamber?? 6 km of drive lines?? 2 outfalls with a total length of 7,7 km?? 2 wastewater treatment plants with a total capacity of 0,6 m3/s?? Closure of 4 WWTP (lakes)?? ?Co-financed unsolicited proposal modality for a term of 24 years.?
US$ 96.50 Millones
Adjudicación Directa (estimada)*: -
* En caso de presentarse terceros interesados, la buena pro se realiza por Concurso.
GROUP 3 ELECTRICITY PROJECTS LINKED TO THE TRANSMISSION PLAN 2025-2034
In PortfolioThis group consists of 4 projects: - New Substation Palca 220 kV, 220 kV Palca-La Pascana Transmission Line, expansions and associated Substations (Arequipa) (ITC Project). - 220 kV Planicie - Industriales Link, expansion to a 3rd circuit. (ITC Project). - 138 kV Abancay Nueva - Andahuaylas Link, expansions and associated substations (ITC Project). - 138 kV San Rafael - Ananea Branch Link, expansions and associated substations (ITC Project). The projects aim to improve the security of electrical transmission in the city of Arequipa and address the capacity deficit of 220/138 kV transformation in the Arequipa electrical system. Self-financed state initiative modality for a term of 30 years (plus construction period).
US$ 167.90 Millones
Buena Pro (estimada): III QUARTER 2025