The project consists of the design, construction, financing, operation and maintenance of a 34.8 km long highway connecting eleven districts of Metropolitan Lima.
Main works included:
- Construction of a 34.8 km long highway, with 06 lanes at asphalt level.
- Construction of 2 tunnels with vaults (2.29 km and 1.93 km respectively of 3 lanes each).
- Construction of bridges, viaducts, overpasses and road interchanges.
Investment Amount: US$ 2,380 MM
Term: 30 years
Modality: Co-financed Unsolicited Proposal
Project Manager: Luis Natal del Carpio
