"220 kV Belaunde Terry – Tarapoto Norte Link (2 circuits), extensions and associated substations Project", "500 kV San José-Yarabamba Link, extensions and associated substations Project", "CTF 220 kV Piura Nueva – Colán Link, extensions and associated substations Project", "CTF SE Lambayeque Norte 220 kV with sectioning of the TL 220 kV Chiclayo Oeste – La Niña/Felam, extensions and associated substations Project" and "Piura Este 100 MVA 220/60/23 kV substation".
It includes the installation of the 220 kV transmission line (Belaúnde Terry – Tarapoto Norte) of 87 km. and the 15 km transmission line at 138 kV (Tarapoto Norte – Diversion point), the sectioning of the TL L-1017 Tarapoto Picota and diversion to the Nueva SE Tarapoto Norte, the sectioning of the LT L-1018 Belaunde Terry - Tarapoto for its connection to the new SE Tarapoto Norte. It also contemplates the implementation of the SE Tarapoto Norte 220/138 kV and the expansion of the SE Belaunde Terry 220 kV.
-500 kV San José-Yarabamba link, extensions and associated SE:
It includes the installation of the “500 kV San José – Yarabamba Transmission Line” of approximately 50 km, as well as the expansion of the existing San José 500/220 kV and Yarabamba 500 kV substations.
-CTF* Link 220 kV Piura Nueva – Colán, extensions and associated SE:
It includes the installation of two 220 kV transmission lines with an approximate length of 67.7 km. to connect the SE Piura Nueva with the future SE Nueva Colán, which will become the convergence focus of the 60 kV lines in order to strengthen the electrical system in the Paita area. It also includes the expansion of the 60 kV system of SE Paita and SE Paita Industrial and the construction of their corresponding transmission lines.
-CTF* SE Lambayeque Norte 220 kV with sectioning of the TL 220 kV Chiclayo Oeste – La Niña/Felam, extensions and associated SE:
It includes the installation of the 220 kV transmission line that will link the projected Lambayeque Oeste and Lambayeque Norte substations, in addition to a variant of the L-2238/L-2239 transmission line for its sectioning and connection to the SE Lambayeque Oeste. Complementarily, it includes the adaptation of the existing 60 kV lines for the connection to the SE Lambayeque Norte and the implementation of a complete transposition cycle in the section of the 220 kV Lambayeque Oeste - La Niña line that is formed as a result of the aforementioned sectioning.
-SE Piura Este 220/60/22.9 kV:
It includes the construction of a new 100 MVA 220/60/23 kV substation called Piura Este, which is expected to feed from the 220 kV double bar of the future 500/220 kV Piura Nueva Substation, representing an expansion of said substation. The project is complemented by the project "Link 500 kV La Niña - Piura, Substations, Lines and Associated Extensions"
*CTF: Connection Transmission Facilities (ITC by its Spanish Acronym)
El proyecto seleccionado no posee Ficha General
Project Schedule
Announcement | Date |
---|---|
1. Convocatoria y Publicación de Bases | Vie. 23.09.2022 |
2. Bases | |
2.1. Consultas a las Bases | Hasta Vie. 26.05.2023 |
2.2. Absolución a consultas a las Bases | Hasta el Vie. 09.06.2023 |
2.3. Publicación de las Bases Consolidadas | Vie. 23.06.2023 |
3. Contratos | |
3.1. Versión Inicial de los Contratos | Vie. 23.09.2022 |
3.2.Sugerencias a la Versión Inicial de los Contratos | Hasta Vie. 28.10.2022 |
3.3. Segunda Versión de los Contratos | Vie 25.11.2022 |
3.4. Sugerencias a la Segunda Versión de los Contratos | Hasta Vie. 31.03.2023 |
3.5. Entrega de la Versión Final de los Contratos | Mie. 26.07.2023 |
4. Calificación | |
4.1. Pago del Derecho de Participación | Hasta Lun. 05.06.2023 |
4.2. Presentación de solicitud de Calificación | Hasta Lun. 12.06.2023 |
4.3. Subsanación de observaciones | Hasta Mie. 28.06.2023 |
4.4. Anuncio de Calificación | Mie. 12.07.2023 |
4.5. Formación o modificación de Consorcios | Hasta Mar. 25.07.2023 |
5. Presentación de Ofertas y Buena Pro | |
5.1. Presentación de los sobres Nro. 1 y Nro. 2 y Buena Pro (*) | Vie. 25.08.2023 |
5.2. Subsanación de Observaciones al sobre Nro. 1 | A los 3 Días de la presentación de Ofertas |
5.3. Apertura del sobre Nro. 2 y Buena Pro | A los 3 Días de la presentación de Ofertas |
6. Fecha de Cierre del Concurso | Mie 29.11.2023 |
En caso algún documento del sobre Nro. 1 tuviera que ser subsanado, se procederá según las actividades 5.2 y 5.3.
(**) En caso de resultar día no laborable se efectuará al día hábil siguiente
(*) En caso algún documento del sobre Nro. 1 tuviera que ser subsanado, se procederá según las
actividades 5.2 y 5.3.
(**) En caso de resultar día no laborable se efectuará al día hábil siguiente